We don't know exactly. So we count it two ways and pay for the bigger one.
This show is made with A.I., and A.I. runs on electricity and water. The companies that run it don't publish what one job costs. So below is our best guess, our worst case, how we got both, and what we have paid for. If you think we're wrong, we want to hear it.
Fetching the count.
A bowl of mac and cheese feeds one kid. One episode can feed every ear in town.
Checking.
Sources: the server maker's rated power for an eight-chip A.I. server (10.2 kilowatts); the Uptime Institute's 2025 survey for building and cooling overhead (1.54); the U.S. EPA's eGRID 2023 grid average for carbon; Lawrence Berkeley National Laboratory's 2023 totals for U.S. data-centre electricity and water; the EPA's figure for a typical car. Think we've got it wrong? [email protected]